Aquaponics 101

Aquaponics

 

Update Aquaponics

I wanted to update you with some pictures of the wall my husband is working on.  He has finished the back wall by filling with gravel concrete and inserting re-bar as it strengthens the wall so the bank of dirt will not push the wall in.  He is Filling in the left side and has pushed the dirt in against the wall as the dirt was less than the back wall.  The left side will be a walkway to the fire pit so it will be filled last as it will not have any dirt, just gravel, on that side.

Aquaponics
Aquaponics

The next thing will be to remove grass on the left side, put down black fabric, then gravel can be placed all the way up to the wall as not much dirt is on that left side.  Most of the dirt is on the back side as that will be left as grass once it is filled in.  Here are some of the pictures during the process:

Aquaponics
Aquaponics

 

Aquaponics 101
Aquaponics 101

“Keeping The Dream Alive”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s